China · Renewables planning · Grid operations
China issues guidance on integrating hydropower, wind and solar at river-basin scale
Key points
China’s National Energy Administration issued guidance on using the flexibility of hydropower to plan, build and operate wind and solar projects across entire river basins. It targets progress by 2030 in major basins, including the Yalong and upper Jinsha. Coordinated dispatch is to account for flood control, ecology, water supply and irrigation as well as electricity generation. The source document is dated November 9.
Questions for local governments in Korea
- How can water supply and environmental flows be protected when coordinating output from Korean dams and nearby wind and solar farms?
- What generation and grid data could local governments jointly disclose when assessing projects in the same basin?
Key excerpts
Section 11 · Coordinated dispatch
View original source · Guidance on accelerating integrated hydropower, wind and solar development in river basinsThe guidance calls for optimizing the joint dispatch of cascade hydropower, wind and solar in a basin while considering flood control, ecology, water supply, irrigation, electricity generation, navigation and safety.
AI tools were used to find source material, draft the briefing and prepare this translation.